Septic Systems
How long does the permitting process take?
Can you design systems for steep slopes?
Typically, county health departments take 3 to 6 weeks to review advanced system designs. We manage both design and submission to prevent delays.
Yes. Our site-specific engineering specializes in complex terrains, utilizing advanced drip irrigation systems where gravity-fed designs are impossible.
What is soil morphology testing?
Can you design small wastewater treatment plants?
It is an in-depth evaluation of soil layers and texture to identify seasonal high water tables, ensuring a more reliable design than simple perc tests.
Yes, we can design both non-discharging and discharging systems.